Date:25/6/2023
Location:Saudi Arabia - Jeddah
Website:www.omsteel.com.sa

Case study of omsteel project

 

 

Executive Summary:

This report outlines the successful completion of the crane installation project at OMSTEEL. The project, initiated on 21/5/2023, involved the installation of 2 cranes to enhance the company’s material handling capabilities. Despite facing several challenges, the project was executed with precision and completed within the allocated timeframe and budget.

Project Overview:

  • Project Name: Crane Installation Project
  • Client: OMSTEEL 
  • Start Date: 21/5/2023
  • Completion Date: 25/6/2023
  • Scope: Procurement, delivery, and installation of 2 cranes.

Challenges Faced:

  1. Site Constraints:

    • Description: Limited space at the installation site posed logistical challenges for both crane delivery and assembly.
    • Solution: Close collaboration with the logistics team to plan and execute a phased delivery and assembly process, ensuring minimal disruption to ongoing operations.
  2. Technical Integration:

    • Description: The new cranes had advanced technical specifications, requiring integration with existing systems.
    • Solution: Engaged in extensive communication with crane manufacturers and our technical team to develop customized solutions for seamless integration, minimizing downtime.
  3. Regulatory Compliance:

    • Description: Complex regulatory requirements and obtaining permits for crane installation.
    • Solution: Established a dedicated regulatory compliance team to liaise with local authorities, ensuring all necessary permits were secured, and the installation adhered to safety standards.
  4. Weather Dependencies:

    • Description: Unpredictable weather conditions, including heavy rainfall, posed risks to both personnel and equipment during installation.
    • Solution: Implemented a robust weather monitoring system, allowing for real-time adjustments to the project schedule and temporary halts during adverse weather conditions.

Problem-Solving Strategies:

  1. Effective Planning:

    • Developed a comprehensive project plan, emphasizing phased delivery and installation to mitigate site space constraints.
    • Collaborated closely with the logistics team to optimize transportation schedules.
  2. Technical Collaboration:

    • Established a direct line of communication with crane manufacturers to address technical challenges and ensure a smooth integration process.
    • Conducted extensive testing and troubleshooting to identify and resolve any technical issues promptly.
  3. Regulatory Liaison:

    • Formed a dedicated team to handle regulatory compliance, engaging with local authorities early in the project to streamline the permit acquisition process.
    • Maintained open communication channels with regulatory bodies throughout the project.
  4. Weather Monitoring and Contingency Planning:

    • Implemented a real-time weather monitoring system to anticipate adverse conditions.
    • Developed contingency plans for temporary halts and adjustments to the project timeline during unfavorable weather.

Project Outcome:

The crane installation project at OMSTEEL was completed on  25/6/2023, meeting all objectives and exceeding performance expectations. The new cranes are fully operational, contributing to increased efficiency and productivity in material handling processes.

Conclusion:

The successful completion of the crane installation project at OMSTEEL underscores the importance of proactive problem-solving, effective planning, and collaborative efforts. The project team’s dedication and expertise have resulted in a modernized material handling infrastructure, positioning OMSTEEL for enhanced competitiveness in its industry.

About

OM Crane Systems is the brand name of OM Steel Company. The company was established in 1986. Our goal is to be one of the leading companies in designing and installing crane systems in the Middle East. Our focus is to design high-quality cranes with well-known brand components. Safety is our priority throughout our company.

Contact

Saudi Arabia - Jeddah 21419 POBox 36499 Fax: +966126374499
Sat - Thu 8:00 - 5:00, Friday - CLOSED
info@omsteel.com.sa
+966126092612

Newsletter

Subscribe to our mailing list